This week I was mainly working with adjusting the text and the design of the design document. Almost everything had to be changed, so I was pretty busy with it. I also adjusted the design based on our style sheet. It has now become a consistent en good looking document. Only the testing part needs to be added, but we are still working on that.
Unfortunately, there were more adjustments last minute, so I have to change all the schedules en charts again. This becomes quite a lot of work since all charts have to look completely different. This weekend I will continue with this. Fortunately, the deadline is 8 July and not 1 July as what I thought. This saves some stress.
For now take a look on the update of the design document.
Leave a comment